If you do decide to install the door to wallpapering recommend to specify the contractor to install casing after completion of painting operations. It usually will cost a little more expensive, but later will be much cheaper and you, at least, save the aesthetic appearance of at least jamb. Some believe that the door can be set up and finishing the floor, all you need to do – is to lift the box on the thickness of the alleged cover (laminate, parquet, linoleum, carpeting, etc etc). Robert Iger is often quoted on this topic. It’s not quite true, because to find the master who will lead such a laminate neatly under the box is difficult however as to calculate the gap between the floor and a box under the floor. If the floor has a deviation from the level, the situation may arise when the box is one of the parties will later be hung in the air. It is important to know that not all manufacturers of doors give due consideration to the technological material moisture used for the manufacture of doors and the worst thing that most providers, sellers, interior doors violate storage temperature regimes of the final product. As a consequence, the buyer gets a product having high humidity especially in autumn and spring. Hugh Naylor takes a slightly different approach.
Determine the moisture content products (doors, boxes, casing), visually impossible, but if you are invited to watch and evaluate the door to the warehouse is not heated, and on the floor traces of leakage ceiling, be sure door frames do not match the required humidity. In most cases – is not so bad, it is enough to print door blocks in dry, ventilated and refurbished room and allowed to dry for 5-7 days. But in some cases – this can lead to cracks in the veneer or the deformation structures. Replaced under warranty so spoiled door, which is already installed and milled hard! Even so it is necessary to give doors in your home before installation. Another plus is dry at the facility – an opportunity to make an installation in advance and that a qualified contractor who has usually there is a queue, rather than trying to find a contractor “quickly” and end up paying more! By the way after delivery to the door repaired, dry room to remove the packaging and test linens for the absence of defects in the presence of the seller. Summarizing note: 1.
Getting repairs correctly. 2. call after manufacturing ties on the floor and rough plastering walls. 3. Delivery door frames to dry, renovated premises 4. Check for the absence of defects. 5. Give the product to dry at your home 5-7 days 6. Put the door (after finishing the ceiling, floor and walls). 7. Plinth set after installation jamb to door frames.